- Diameter: PT 1/4
- Weight: 0.3kg
- Structure: Filter regulator
- Working temperature: 0-60℃
- Oil recommendation: Gas turbine No. 1 (ISOVG32)
Product description install and use
1, please pay attention to the installation of cleaning pipes and joints to avoid objects flying into the respiratory tract.
2, the installation should pay attention to the direction of the airflow and the direction of the same arrow, pay attention to take care of the tooth type is correct.
3, the pressure regulator: up adjustment, clockwise rotation, the pressure increases, counterclockwise rotation, pressure loss. Adjust to the pressure required, the teeth will be pressed to lock the state.
4, drainage: no pressure, water automatically discharged, with air pressure, the drainage column up to push, drainage, drainage is completed, the drainage column release, When the water level exceeds the upper limit, please drain in time, otherwise it will lead to poor dehumidification.
5, the amount of oil adjustment: needle clockwise needle, the amount of oil down, counterclockwise rotation of the needle, the amount of oil decreased. Air flow regulation, adjust the needle valve, air flow, bulky oil, air flow is small and oil droplets reduced.
maintain
1, clean/replace the filter: remove the filter, blowing from the inside to the outside, you can reuse
2, transparent PC cup: remove the PC cup, wipe with a clean cloth, can not be suMaterial PC Material to clean.
Sold by the store