product_image_name-Generic-10Pcs Axial Polyester Film Capacitor With Long Lead 0.022uF-1product_image_name-Generic-10Pcs Axial Polyester Film Capacitor With Long Lead 0.022uF-2product_image_name-Generic-10Pcs Axial Polyester Film Capacitor With Long Lead 0.022uF-3product_image_name-Generic-10Pcs Axial Polyester Film Capacitor With Long Lead 0.022uF-4product_image_name-Generic-10Pcs Axial Polyester Film Capacitor With Long Lead 0.022uF-5product_image_name-Generic-10Pcs Axial Polyester Film Capacitor With Long Lead 0.022uF-6product_image_name-Generic-10Pcs Axial Polyester Film Capacitor With Long Lead 0.022uF-7product_image_name-Generic-10Pcs Axial Polyester Film Capacitor With Long Lead 0.022uF-8

Share this product

Shipped from abroad

10Pcs Axial Polyester Film Capacitor With Long Lead 0.022uF

₦ 5,040
₦ 9,58047%

In stock

+ shipping from ₦ 1,832 to LEKKI-AJAH (SANGOTEDO)
0 out of 5
(No ratings available)

4offers starting from₦ 5,040

See More Offers

Promotions

Delivery & Returns

Shipped from abroad 

Choose your location

Pickup Station

Delivery Fees ₦ 1,832
Ready for pickup between 10 June and 12 June if you place your order within the next 13hrs 30mins

Door Delivery

Delivery Fees ₦ 2,592
Ready for delivery between 10 June and 12 June if you place your order within the next 13hrs 30mins

Return Policy

Free return within 7 days for ALL eligible itemsDetails

Seller Information

CsHome

78%Seller Score

181 Followers

Follow

Seller Performance

Shipping speed: Good

Quality Score: Good

Customer Rating: Average

Compare Offers

See all offers
₦ 5,040

Sold by: YoMandy | Seller Score: 84%

₦ 5,040

Sold by: LaLaTree | Seller Score: 90%

₦ 5,040

Sold by: SaveMoney | Seller Score: 84%

Product details

Description:
1. High quality polyester film capacitors with stable performance.
2. The

Specificationss of the capacitors is marked on its surface.
3. Lightweight with simple structure, easy to use.
4. Great choice for electronic professionals or enthusiasts.
5. Suitable for old radios and tube amplifiers.


Specificationss:
Material: polyester film
Quantity: 10pcs
Voltage: 630V
Capacitance: 0.022uF
Diameter: 5.7mm/0.22in
Capacitor Body Length: 15.3mm/0.6in
Weight: Approx. 9g
Package Included:
10 x Axial Polyester Film Capacitors
Note:
1. Due to the difference between the monitors and light effect, the
picture may not reflect the actual color
of the item.
2. Please allow small deviation due to manual measurement. Thanks for
your understanding.Description:
1. High quality polyester film capacitors with stable performance.
2. The

Specificationss of the capacitors is marked on its surface.
3. Lightweight with simple structure, easy to use.
4. Great choice for electronic professionals or enthusiasts.
5. Suitable for old radios and tube amplifiers.


Specificationss:
Material: polyester film
Quantity: 10pcs
Voltage: 630V
Capacitance: 0.022uF
Diameter: 5.7mm/0.22in
Capacitor Body Length: 15.3mm/0.6in
Weight: Approx. 9g
Package Included:
10 x Axial Polyester Film Capacitors
Note:
1. Due to the difference between the monitors and light effect, the
picture may not reflect the actual color
of the item.
2. Please allow small deviation due to manual measurement. Thanks for
your understanding.

Specifications

Key Features

  • High quality polyester film capacitors with stable performance.
  • The specifications of the capacitors is marked on its surface.
  • Lightweight with simple structure, easy to use.
  • Great choice for electronic professionals or enthusiasts.
  • Suitable for old radios and tube amplifiers.

What’s in the box

10 x Axial Polyester Film Capacitors
Note:
1. Due to the difference between the monitors and light effect, the
picture may not reflect the actual color
of the item.
2. Please allow small deviation due to manual measurement. Thanks for
your understanding.

Specifications

  • SKU: GE779IP7W60R8NAFAMZ
  • Model: 无型号
  • Size (L x W x H cm): 12x5x1
  • Weight (kg): 0.008
  • Color: N/A
  • Main Material: plastic

Verified Customer Feedback

Customers who have bought this product have not yet posted comments

10Pcs Axial Polyester Film Capacitor With Long Lead 0.022uF

10Pcs Axial Polyester Film Capacitor With Long Lead 0.022uF

₦ 5,040
₦ 9,58047%
Questions about this product?

Recently Viewed

See All