product_image_name-Generic-U.S.A Two Little Fishies NP bean beans reducing NO2 N03  PO4 phosban reactor 1 Multifunction reactor filter equipment-1

Share this product

Shipped from abroad

U.S.A Two Little Fishies NP bean beans reducing NO2 N03 PO4 phosban reactor 1 Multifunction reactor filter equipment

₦ 203,740
₦ 350,70042%

In stock

+ shipping from ₦ 36,465 to LEKKI-AJAH (SANGOTEDO)
Variation available

Promotions

Delivery & Returns

Shipped from abroad 

Choose your location

Pickup Station

Delivery Fees ₦ 36,465
Arriving at pickup station between 30 May & 05 June when you order within next 15hrs 40mins

Door Delivery

Delivery Fees ₦ 36,745
Ready for delivery between 30 May & 05 June when you order within next 15hrs 40mins

Return Policy

Free return within 7 days for ALL eligible itemsDetails

Seller Information

wu zhi shan bo bi yi shang mao you xian gong si

98%Seller Score

2 Followers

Follow

Seller Performance

Order Fulfillment Rate: Excellent

Quality Score: Excellent

Product details

Notes:

-The product does not contain retail packaging. If you need the product packaging, please contact us.We will ensure that the goods are in good condition.

image

Product Name:U.S.A Two Little Fishies

Operating Instructions for the PhosBan Reactor 1 ™ Technical Data Capacity Use with up to a maximum of 200 grams (385 ml) of PhosBan, or a media height of 5 inches (13 cm). Aquarium size One reactor for up to 1 gallons (568 Liters). Multiple reactors may be used for larger aquariums. Recommended flow rate ca. 20 - 30 gal/hr (75 - 115 l/hr). Too much flow can grind PhosBan. Connection for hoses 1/2 inch (12.7 mm) i.d. The inlet and outlet flexible 90° fittings rotate to suit your installation. ant Notes: Do not use a media bag in the PhosBan Reactor. Simply p PhosBan or other GFO media inside it according to the instructions. Don't over or under fill the column. Max 5 in (13 cm) of GFO media, min 2 in (5 cm). When using only activated carbon, the entire column can be filled. PhosBan may be mixed with phosphate-free activated carbon (HydroCarbon2 from Two Little Fishies). This can provide the neceary media volume when le than 100 grams (190 ml) of PhosBan is used. Do not p ball valve on the exit pipe. Restricting the flow on the exit pipe preurizes the reactor and can cause leaks.

Description The PhosBan Reactor1™ is designed with the upflow principle to achieve the most efficient use of PhosBan™ or other chemical filter media. By pushing water from the bottom upward through a dispersion plate, it forces an even distribution of water through the media. 1. Preparing the Reactor Unpack the reactor. Open reactor lid by turning counter clockwise. Check parts list to confirm that all parts are present. The reactor is supplied with all the parts needed to operate it except for the hose and pump. The pump used can be a powerhead, such as a Maxijet 0, or the supply of water can be tapped off of a circulating pump already in use on the aquarium (see diagrams 1-4 on instructions page two). The pump should have 100-200 gph (380-760 l/hr) capacity, although the flow must be reduced using the supplied ball valve. If the center tubes are not already d to the dispersion plates, insert the end of the 9 inch center tube into one dispersion plate until it stops, and slide one of the sponges onto the tube so that it rests on top of the dispersion plate. Insert this aembly into the reactor column. It may be neceary to use tongs or a yardstick to keep the lower sponge resting on top of the dispersion plate when you insert it into the reactor column. Add about 1 cup of water to the reactor. Use a yardstick or tongs to push out the large air bubbles trapped in the lower sponge. 1a. Adding PhosBan media Before adding PhosBan to the reactor, temporarily cover the top of the 9 inch center tube with a piece of tape. This will prevent PhosBan from entering the tube when you add it to the column. To minimize dust evolution, wet the PhosBan first. Use a large spoon or scoop to put the PhosBan into the reactor. After adding PhosBan to the reactor column, remove the tape from the center tube. 1b. Finishing the reactor aembly Attach the remaining dispersion plate onto the top of center tube. Insert the remaining 2 inch length of rigid tube into the top of the dispersion plate (if not d already). Slide the remaining sponge on top of the center tube above the dispersion plate. Pre it down to be sure it is sitting flat all the way around the dispersion plate. Inside the top of the lid there is a flat plastic washer and on top of it an O-ring. Check to be sure the O-ring is seated properly. With the reactor sitting upright, attach lid on top of the reactor body by inserting the center collar (located on the underside of the lid) over the top of the center tube. Rotate lid on the threads until it becomes stiff (hand-tight) to seal and close the reactor. Do not overtighten! The flat washer allows slippage and makes it easier to open the reactor. It is otherwise not neceary. 2. Locating the reactor The PhosBan reactor can be seated upright in the cabinet, in the filter sump, upright on the floor below the aquarium or hanging on the side or rear of an aquarium. For hanging installations, use threaded bolt provided in the base plate to level it against the aquarium wall. Wherever it is located, the reactor must be upright and level to operate properly. To prevent any risk of back-siphoning, the outlet of the water return hose should not be located below the water line if the reactor is located below the level of the aquarium or below where the return line enters the aquarium or sump. See diagrams 1-4 for suggested installation options. 3. Connecting the Pump Attach the ball valve to the soft 90 fitting on the input pipe (center barbed connector on the lid). Connect a length of 1/2 inch i.d. hose from the pump output to the ball valve. Connect another length of hose to the barbed fitting that slides into the soft 90 fitting on the water output pipe (outer hose barb connector on the lid) to return water to the aquarium or sump. It is not neceary to use hose clamps to secure the hose connections on the supplied fittings because they are barbed. It may be neceary to use a hose clamp to secure the connection to the pump. Do not let the weight of the pump pull the hose since this can cause a leak at the soft 90 fitting. 4. Initial Operation and Adjustment Once the lid is securely fastened, the reactor is level, all of the hoses are securely attached, and the pump is located in the aquarium or sump, direct the return hose into a bucket, open the ball valve, and connect the pump to the mains electricity. Allow water to fill the reactor for 2 to 3 seconds and then close the ball valve to stop the flow. Partially open the valve slowly to about 20 gph to purge air from the outflow pipe and allow the initial dusty 1/2 gallon of water to empty into the bucket. When the water runs clear, close the valve and reposition the return hose to feed water back to the aquarium. Adjust the flow with the ball valve so that the PhosBan granules are tumbling slightly at the surface. A section of clear water will be located above the granules.

imageimageimage

image

imageimage

Specifications

Key Features

  • Other:Voltage
  • 1W:Power
  • Mainland China:Origin
  • fish:Type
  • 0:power

What’s in the box

1X U.S.A Two Little Fishies NP bean beans reducing NO2 N03 PO4 phosban reactor 150 Multifunction reactor filter equipment

Specifications

  • SKU: GE779LS4GTA48NAFAMZ
  • Model: IRJguolvqijpeijian4179
  • Production Country: China
  • Weight (kg): 0.2
  • Color: filter and beans
  • Main Material: PVC
  • Care Label: No direct sundlight, cleaning with low percentage alcohol
  • Shop Type: Jumia Mall

Verified Customer Feedback

Customers who have bought this product have not yet posted comments

U.S.A Two Little Fishies NP bean beans reducing NO2 N03  PO4 phosban reactor 1 Multifunction reactor filter equipment

U.S.A Two Little Fishies NP bean beans reducing NO2 N03 PO4 phosban reactor 1 Multifunction reactor filter equipment

₦ 203,740
₦ 350,70042%
Questions about this product?

Recently Viewed

See All