This website uses cookies. For further information on how we use cookies you can read our Privacy and Cookie notice
HomePet SuppliesDogsCollars, Harnesses & LeashesLeashes5 Colors Reflective Strong Pet Long Lead Leash Large Dog Running Rope Safety Leash Pink, 150cm Long And 1.2cm Wide
Shipped from abroad
5 Colors Reflective Strong Pet Long Lead Leash Large Dog Running Rope Safety Leash Pink, 150cm Long And 1.2cm Wide
₦ 19,000
₦ 37,90050%
In stock
+ shipping from ₦ 4,135 to LEKKI-AJAH (SANGOTEDO)
0 out of 5
(No ratings available)Variation available
Promotions
Delivery & Returns
Shipped from abroad
Choose your location
Pickup Station
Delivery Fees ₦ 4,135
Arriving at pickup station between 31 May & 06 June when you order within next 21hrs 17mins
Door Delivery
Delivery Fees ₦ 4,415
Ready for delivery between 31 May & 06 June when you order within next 21hrs 17mins
Return Policy
Free return within 7 days for ALL eligible itemsDetails
Warranty
1
Seller Information
Meat Ball
60%Seller Score
38 Followers
Seller Performance
Order Fulfillment Rate: Very Poor
Quality Score: Excellent
Customer Rating: Good
Product details
Features:Made of high quality nylon, strong and durable.
Strong metal buckle, easy to install.
Night reflective design, ensure the safety when walking the dog.
paded handle, more comfortable to hold.
Specification:
Material: Nylon
: Black, Red, Blue, Green, Pink
Size:
Long 150 cm
Leash dia 2.5 cm
Package Included:
1 x Reflective Dog Leash
Note:
1. Please allow 1-3cm error due to manual measurement.
2. Please understand that colors may exist chromatic aberration. Thanks for understanding!
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
Strong metal buckle, easy to install.
Night reflective design, ensure the safety when walking the dog.
paded handle, more comfortable to hold.
Specification:
Material: Nylon
: Black, Red, Blue, Green, Pink
Size:
Long 150 cm
Leash dia 2.5 cm
Package Included:
1 x Reflective Dog Leash
Note:
1. Please allow 1-3cm error due to manual measurement.
2. Please understand that colors may exist chromatic aberration. Thanks for understanding!
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
Specifications
Key Features
Made of high quality nylon, strong and durable.
Strong metal buckle, easy to install.
Night reflective design, ensure the safety when walking the dog.
paded handle, more comfortable to hold.
- Easy to use
- Exquisite Workmanship
- Well Made
- Best Choice and best discounts
- Customer Care is Our Top Priority
- Offer is Subject to Availability
- Big Sale
What’s in the box
1 x Reflective Dog Leash
Specifications
- SKU: GE779LS2YK7TYNAFAMZ
- Product Line: Fouani Nigeria
- Model: JMVANJIA4325928
- Production Country: China
- Size (L x W x H cm): 25 x 15 x 2
- Weight (kg): 0.3
- Certifications: Organic
- Color: multicolor
- Main Material: 1
- From the Manufacturer: 1
- Care Label: 1
- Shop Type: Jumia Mall/Food
Verified Customer Feedback
Customers who have bought this product have not yet posted comments
5 Colors Reflective Strong Pet Long Lead Leash Large Dog Running Rope Safety Leash Pink, 150cm Long And 1.2cm Wide
₦ 19,000
₦ 37,90050%
Questions about this product?